A State of Colorado Demolition Permit, Asbestos Test results, SLV Landfill Waste Generator Packet needs to be submitted to the Landfill Manager for approval. Once approved, the SLV Landfill requires a 24-hour notice prior to the material being transported to the SLV Landfill if material is Friable Asbestos or Contaminated Soil. Also, a Waste Manifest is required for each incoming load.
Regulation 8 Part B |
On October 16, 2019, the Colorado Air Quality Control Commission adopted revisions to Colorado Regulation No. 8, Part B, which clarified the requirements for single-family residential dwellings. Therefore, as of October 17, 2019, single-family residential dwellings are once again subject to all applicable asbestos requirements under Colorado Regulation No. 8, Part B. This includes inspection, permitting, and abatement requirements. |