A demolition permit is required with 24-hour notice to the landfill before the material is brought in with the Asbestos test.
SLV Regional Solid Waste Authority Demolition and Renovation Requirements | |
State of Colorado Demolition Packet | Asbestos Inspection and Remediation |
Regulation 8 Part B |
On October 16, 2019, the Colorado Air Quality Control Commission adopted revisions to Colorado Regulation No. 8, Part B, which clarified the requirements for single-family residential dwellings. Therefore, as of October 17, 2019, single-family residential dwellings are once again subject to all applicable asbestos requirements under Colorado Regulation No. 8, Part B. This includes inspection, permitting, and abatement requirements. |